HOA approval · Shed, pergola, or addition

HOA approval for a shed, pergola, or addition

New structures get the most scrutiny, because they change the outline of the house from the street or from a neighbour's yard.

What the committee looks at

  • Footprint and height, with dimensions on a site plan
  • Materials and colors, and how they relate to the house
  • Placement, setbacks, and visibility from common areas
  • Roof form and whether it reads as part of the original home

What to submit

Most associations ask for these before they will review a shed, pergola, or addition application:

  • Plan set
  • Site plan showing the location on the lot
  • Elevation or roof layout
  • Contractor license

Frequently requested as well:

  • Property survey
  • Material sample or photo
  • Photos of the area today

Details you will be asked for

  • Type — Shed, Pergola, Gazebo, Screen enclosure, Room addition, Detached garage · usually required
  • Footprint (sq ft) · usually required
  • Height (ft) · usually required
  • Material and color · usually required

Elevations matter more than photos

A committee needs to see the structure's height and proportion against the house. A simple elevation drawing does that; a product brochure does not.

City permits are separate

Architectural approval is not a building permit, and a permit is not architectural approval. Most projects need both, and the association often asks to see the permit set.

Common questions

Do I need HOA approval for shed, pergola, or addition?
In most associations, yes — any change to the exterior of your home or lot usually needs architectural approval before work starts. Your association's guidelines say which changes are covered, and it has to give members that notice annually.
What documents does an HOA need for shed, pergola, or addition?
Most committees ask for: plan set, site plan showing the location on the lot, elevation or roof layout, contractor license. Some also ask for property survey, material sample or photo, photos of the area today.
How long does approval take?
It depends on the association and the project. Some project types have a statutory written-decision deadline; for everything else the association's own procedure sets the maximum response time, and it must publish it.
What happens if I start work without approval?
An association can normally require the work to be corrected or removed and can fine the owner. It is far cheaper to submit first, even when the project seems obviously acceptable.
Let us handle it. We identify your association, prepare the application, submit it the way that association accepts submissions, and follow up until there is a decision. The committee still makes that decision. Request a free pre-check or see how it works for contractors.