HOA approval · Landscaping

HOA approval for landscaping and turf removal

Associations review the design, not the decision to use less water — California law is explicit about the difference.

What the committee looks at

  • A scaled plan showing what is removed and what replaces it
  • Plant list, mature coverage, and how bare ground is avoided
  • Artificial turf product, pile height, and color
  • Tree removal, which is often a separate approval

What to submit

Most associations ask for these before they will review a landscaping application:

  • Site plan showing the location on the lot
  • Photos of the area today

Frequently requested as well:

  • Manufacturer spec sheet

Details you will be asked for

  • What's changing · usually required
  • Removing turf
  • Removing a tree
  • Changing irrigation

Coverage is what committees judge

Plans are usually denied for looking sparse rather than for using drought-tolerant plants. Show mature sizes and the percentage of ground covered.

Irrigation changes belong in the application

Converting spray to drip, capping heads, or changing zones affects neighbouring lots and shared systems, so include it rather than treating it as maintenance.

What the law says in California

Cal. Civ. Code § 4735(a)

Your HOA cannot ban low water-using plants or artificial turf in place of a lawn (Civil Code § 4735).

A governing document or architectural or landscaping guideline is void and unenforceable if it prohibits, or has the effect of prohibiting, low water-using plants as a group or as a replacement for turf, or artificial turf or another synthetic surface that resembles grass.

Read the statute

Common questions

Do I need HOA approval for landscaping?
In most associations, yes — any change to the exterior of your home or lot usually needs architectural approval before work starts. Your association's guidelines say which changes are covered, and it has to give members that notice annually.
What documents does an HOA need for landscaping?
Most committees ask for: site plan showing the location on the lot, photos of the area today. Some also ask for manufacturer spec sheet.
How long does approval take?
It depends on the association and the project. Some project types have a statutory written-decision deadline; for everything else the association's own procedure sets the maximum response time, and it must publish it.
What happens if I start work without approval?
An association can normally require the work to be corrected or removed and can fine the owner. It is far cheaper to submit first, even when the project seems obviously acceptable.