HOA approval · EV charger

HOA approval for an EV charger

Most EV charger reviews come down to one question: what will anyone else see?

What the committee looks at

  • Where the unit is mounted, and whether it is visible from the street
  • Whether conduit runs on an exterior wall, and how it is finished
  • Panel or service upgrades that add exterior equipment
  • Insurance and responsibility where parking is shared

What to submit

Most associations ask for these before they will review a ev charger application:

  • Photos of the area today
  • Manufacturer spec sheet
  • Contractor license

Frequently requested as well:

  • Site plan showing the location on the lot

Details you will be asked for

  • Mounting location — Inside garage, Garage exterior wall, Driveway pedestal, Carport · usually required
  • Visible from the street
  • Exterior conduit required

Interior conduit removes most objections

Running conduit inside the garage, or painting exterior conduit to match, resolves the usual aesthetic concern without changing the installation.

California puts a clock on it

An association that does not deny an EV charging application in writing within the statutory period may be treated as having approved it. Submit in a way that documents the date of receipt.

What the law says in California

Cal. Civ. Code § 4745

California law (Civil Code § 4745) makes any HOA rule that effectively prohibits or unreasonably restricts an EV charging station void.

A covenant, restriction, or condition that effectively prohibits or unreasonably restricts installation or use of an electric vehicle charging station is void and unenforceable.

Read the statute

Cal. Civ. Code § 4745(e)

Your HOA has 60 days from receiving an EV charger application to deny it in writing. If it doesn't, California law (Civil Code § 4745(e)) deems it approved — unless it reasonably asked for more information.

Approval or denial of an EV charging station application must be in writing. If it is not denied in writing within 60 days of receipt, it is deemed approved, unless the delay is the result of a reasonable request for additional information.

Read the statute

Common questions

Do I need HOA approval for ev charger?
In most associations, yes — any change to the exterior of your home or lot usually needs architectural approval before work starts. Your association's guidelines say which changes are covered, and it has to give members that notice annually.
What documents does an HOA need for ev charger?
Most committees ask for: photos of the area today, manufacturer spec sheet, contractor license. Some also ask for site plan showing the location on the lot.
How long does approval take?
It depends on the association and the project. Some project types have a statutory written-decision deadline; for everything else the association's own procedure sets the maximum response time, and it must publish it.
What happens if I start work without approval?
An association can normally require the work to be corrected or removed and can fine the owner. It is far cheaper to submit first, even when the project seems obviously acceptable.
Let us handle it. We identify your association, prepare the application, submit it the way that association accepts submissions, and follow up until there is a decision. The committee still makes that decision. Request a free pre-check or see how it works for contractors.